You run the roof line. Phoenix Solar Removal runs the solar line — shutdown, remove, stage, remount, reconnect, and production confirmed. Hire us as a sub or send the homeowner direct.
Short answer
Roofers keep tear-off, dry-in, and shingle or tile scope. PSR owns the array: lockout and shutdown, panel removal, clear deck for your crew, remount with correct feet and flashing, reconnect, and proof the system is producing again — not merely “panels back on the roof.”
Why roofers bring a solar specialist
Reconnect-without-proof and remount flashing mistakes are how a finished re-roof still leaves a dead array. Soft background: our homeowner post on solar panel removal for roof replacement in Phoenix covers failure points. This page is the B2B handoff so your bid language stays clean.
We do not invent labor dollars or day counts here. Cost drivers and offline framing live on solar panel removal cost / offline.
What we need on the bid
Share early:
- Job address
- Rough panel count
- When you need the deck clear
- Full tear-off vs leak or partial under the array
That is enough to line up solar with your roof schedule without guessing.
Crew order on site
Typical order: solar clears the deck → roof works → solar returns for remount and reconnect. Partial scopes under an array still need a defined handoff so neither crew is waiting on an unspoken assumption.
Invoicing
Solar is its own line. Hire PSR direct or as a roofing sub — both patterns are how we work with Phoenix-metro roofers. See for roofing companies.
Service area
Crews for Phoenix, Glendale, Peoria, Surprise, Scottsdale, and metro when schedule allows. This is the Phoenix / West Valley detach lane — not East Valley maintenance marketing.
When the job is actually done
The solar job is done when panels are remounted, reconnected, and confirmed producing. Photo documentation follows live site claims — we do not invent volumes or license numbers in this post.
FAQ
Should my roofing company remove solar panels ourselves?
You can — but the solar side is its own specialty: lockout, racking, remount with correct feet and flashing, reconnect, and proof of production. PSR runs that line so roofers keep the roof scope.
Can PSR work as our sub?
Yes. Hire direct or as a roofing sub; solar is invoiced as its own line. Share address, rough panel count, deck-clear timing, and full vs partial scope.
When is the solar job done for our client?
When panels are remounted, reconnected, and confirmed producing — not when they are merely back on the roof.
Do you invent blog prices for detach and reset?
No. Cost drivers are explained on the cost/offline post. Send address and scope for a real solar-side number.
Next step
Send address, rough panel count, deck-clear date, and full vs partial scope via contact. Roofers can start at for roofing companies.